This weekend it actually did not rain during the day, so off we went to get stuck in. First job was a lengthy polytunnel repair following wind damage which separated the cover along the stitches. I got some wide polytunnel repair tape to do the job, so hopefully it will last. Then pulled a load of leeks up and tidied the shed. Today i dug up a load of tired celery, dug one bed over and added a load of compost over it from one of the composters. Then turned the composters and topped them up. Dug another bed about halfway (they are about 7x4 feet). Pulled up weeds and mote general tidying. That'll be it until next weekend.