The asbestos removal men turned up yesterday,to frosty to go on scaffolding I mentioned that the corded cover had blown off,answer it's not our responsibility we were told to leave the roof by the main contractor,I told them at 8.15 to fix the felt put the tiles back on take the scaffolding down remove the skip and beggar off and dont come back ,9am the asbestos removal big wigs were on site with the main contractor big wigs taking photos,an assessor is ringing tomorrow to arrange a visit ,theres now a big blue tent over the back part of the roof so that the asbestos can be removed tomorrow, the roofing job was supposed to start in April ,jezza