Chatting => Design and Construction => Topic started by: al78 on February 02, 2020, 22:18
-
I've (finally) finished getting my greenhouse reinforced against strong winds and am close to the point of being able to start growing things in it. I have noticed that on the sloping roof sides, there is a gap between the roof panels and the wall panels, of about a few mm, maybe a little more. It is not due to incorrect installation, it is just the way the frame is built. Since I am planning to start using it in April, it is unlikely to be an issue (and may be beneficial if it is warm), but next year, if I want to try starting things in February or early March, then lack of heat retention will be a problem. What do you think is a good way to fill long gaps of this size?
-
I used exterior mastic to fill a few gaps in mine - sticks well but doesn't set hard so can be removed fairly easily at a later date.